Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange

Product Details
Customization: Available
Standard: ANSI, DIN, GB, JIS, GOST
Type: Welding Flange
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
3000000 RMB
Plant Area
>2000 square meters
  • Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange
  • Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange
  • Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange
  • Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange
  • Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange
  • Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange
Find Similar Products
  • Overview
  • Product Parameters
  • Packaging & Shipping
  • Detailed Photos
  • Company Profile
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
Flange 325
Connection
Welding
Manufacturing Way
Forging
Product Name
Flange Stainless Steel Butt Welding Pipe Fittings
Class
Class150-Class2500
Flange Face Type
ASME B16.48-2010, API 590-1993
Quality
High Quality
Transport Package
Wooden Pallet, Wooden Case, etc
Specification
1/2′-48"
Trademark
Hebei Cangrun Pipeline Equipment Co., Ltd.
Origin
China
HS Code
7307910000
Production Capacity
5000 Tons/ Year

Packaging & Delivery

Package Size
100.00cm * 100.00cm * 100.00cm
Package Gross Weight
500.000kg

Product Description


Products
 
Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange
WN Flange 
 
RTJ  Flange 
Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange
 
Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange
Blind Flange 

Production
 
Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange
Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange
Product Parameters
 
 

Flange Type

WN/LWN/SO/blind, lap joint flange, SW, threaded flange, plate flange

Anchor, swivel, girth , reducing, orifice plate, bleed ring, spacer ring, paddle blind

Spectacle blind

Rings, forgings, disc, shaft sleeves

Standard

ASME B16.5, ASME B16.47 Series A/B, ASME B16.48, MSS SP-44

JIS B2220, EN1092-1, DIN2527, DIN2543, DIN2544, etc.

BS4504 BS10 Table D/E

NORSOK L-005

AWWA C207

Size

1/2"-48"

Sealing

Surface

RF FF RTJ TF GF LF LM

Flange

Face Finish

125-250 AARH(it is called smooth finish)

250-500 AARH(it is called stock finish)

Coating

Vanish, yellow paint, anti-rust oil, galvanizing etc

Material

Alloy Steel

ASTM/ASME A/SA350 LF2

ASTM/ASME A/SA694 F52, F56 F60, F65, F70

ASTM/ASME A/SA182 GR F5,F9, F11,F12,F22,F91

Carbon Steel

ASTM /ASME A/SA105(N)

Duplex Stainless Steel

ASTM/ASME A/SA182 F44,F45,F51,F53,F55,F60,F61

Stainless Steel

ASTM/ASME A/SA182 F304,304L,304H,309H,310H,316,316H,316L,316LN, 317,317L,321,321H,347,347H

Nickel Alloy Steel

ASTM/ASME B/SB564 UNS N02200(NICKEL 200), UNS N04400(MONEL 400), UNS N08825( INCOLOY 825), UNS N06600(INCONEL 600),

UNS N06601(INCONEL 601), UNS N06625(INCONEL 625), UNS N10276(HASTELLOY C276),

ASTM/ASME B/SB160 UNS N02201(NICKEL 201), ASTM B/SB472 UNS N08020(Alloy 20)

Titanium

ASTM/ASME B/SB381 Grade 2, Grade 5, Grade 7

Copper Alloy

ASTM/ASME B/SB151 UNS C70600(CuNi 90/10), C71500(CuNi 70/30)

Packing

Wooden case or pallet or as per the clients' request.

Application

Natural gas, petroleum, chemical industry, electric power, metallurgy thermodynamic fields, water supply engineering, steam heating, hydroelectric power station and long pipeline transportation projects.  

Remarks

Other materials and drawings are available.

Packaging & Shipping

 

Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange

Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange


Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange

Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange

Detailed Photos

Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange

Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange

Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange

Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange

Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange

Company Profile

 

Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange

Hebei Cangrun Pipeline Equipment Co.,Ltd specialized in pipe fittings ,flanges and nipples. Our company has strong technical force. With complete

production equipment, it has more than 120 sets of production equipment, including 8000 tons of four column press, 1600 tons of pushing machine,

800 tons of large pipe bending machine and 8 tons of forging hammer. It can produce valves, flanges, elbows, tees, crosses, reducers, pipe

caps, sockets and other pipe fittings and extension products of all specifications of carbon steel, alloy steel, stainless steel, pipeline steel, low-

temperature steel and other materials according to domestic and international and industrial standards, We adhere to quality first, customer first, is

our purpose.

Test
 
Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange
Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange
Certifications

 

Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange
Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange
Flange Stainless Steel Butt Welding Pipe Fittings Steel Flange

 
FAQ

 

1. What about your MOQ ?

MOQ is one piece, we can offer sample for free, customer just pay the transport charge.

2.What is the average lead time?

For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times

become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with

your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do

so.

3.What about payment term ?

You can make the payment to our bank account, Western Union or PayPal:

30% deposit in advance, 70% balance against the copy of B/L.

4. What about package ?

As usual with wooden pallet, wooden  case, we can also pack the products as customers' requirement.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now