Customization: | Available |
---|---|
Standard: | ANSI, DIN, GB, JIS, GOST, BSW |
Type: | Welding Flange |
Still deciding? Get samples of US$ 5/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Flanges of welding neck, socket welding, threaded, blind, slip on, etc.
Standard | ANSI B16.5/ANSI B16.47/API 605 MSS SP44,AWWA C207-2007/ANSI B16.48 GOST12821-80-81/ GOST12820-80/ GOST33259-2015/ 1836/1821/1820 DIN2503/2502/2576/2573/860296/86030/2565-2569/2527/2630-2638 UNI6091/6092/6093/6094/6095/6096/6097/6098/6099 JIS B2220/B2203/B2238/G3451 BS4504 EN1092 SABS1123 |
Material | Carbon steel: Q235A, Q235B,Q345BC22.8, ASTM A105, SS400 |
Alloy steel: ASTM A694,F42,F46, F52,F56, F60, F65, A350 LF2 , | |
Stainless steel: ASTM A182 F1, F5, F9, F22, F91, 310/F304/304L/F316/F316L, F321, F347. |
|
Surface treatment |
Galvanized(hot,cold),varnish Method rust oil Plastic spraying |
Size:1/2"-24"
Pressure:150lbs-2500lbs PN0.6-PN16.0
Facing:RF/RJ/ FF/MF/TG/
Standard:BS4504/GOST/ANSI(ASME)16.5 16.47/DIN/JIS/UNI/GB...
We have strict quality control system.
Our quality control department will test from the material to production line, packing line, shipping line.
So Please rest assured that the quality will be good and stable.
Packaging:
1. Plywood pallet
2. Plywood case
3. According to customer's requirements
Shipping:
We could ship by sea, by air, and for small goods we could ship by express
HEBEI CANGRUN PIPELINE EQUIPMENT CO., LTD.
Our company has strong technical force. With complete production equipment, it has more than 120 sets of production equipment, including 8000 tons of four column press, 1600 tons of pushing machine, 800 tons of large pipe bending machine and 8 tons of forging hammer. It can produce valves, flanges, elbows, elbows, tees, crosses, reducers, pipe caps, sockets and other pipe fittings and extension products of all specifications of carbon steel, alloy steel, stainless steel, pipeline steel, low-temperature steel and other materials according to domestic and international and industrial standards, We adhere to quality first, customer first, is our purpose.1. What about your MOQ ?
MOQ is one piece, we can offer sample for free, customer just pay the transport charge.
2.What is the average lead time?
For samples, the lead time is about 7 days.
For mass production, the lead time is 20-30 days after receiving the deposit payment.
The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
3.What about payment term ?
You can make the payment to our bank account, Western Union or PayPal:
30% deposit in advance, 70% balance against the copy of B/L
If any questions feel free to contact us directly.
Welcome to contact us if any inquiry. Hope to start long-term good business.