Product Description

Size:
Seamless fittings |
1/2"-32" DN15-800 |
welding fitting |
6"-120" DN150-DN3000 |
Wall Thinkness |
sch10.sch20.sch30.std sch40 sch60 xs sch80 sch100 sch120 sch140 sch160 xxs sch5s sch20s sch40s sch80s |
Material:
Carbon steel: |
ASTM/ASME A234 WPB WPC |
Alloy |
ASTM/ASME A234 WP 1-WP12-WP 11-WP 22-WP 5-WP |
Stainless Steel |
ASTM/ASME A403 WP 304-304L-304H-304LN-304N
ASTM/ASME A403 WP 316-316L-316H-316LN-316N-316Ti
ASTM/ASME A403 WP 321-321H ASTM/ASME A403 WP 347-347H |
Low Temperature Steel: |
ASTM/ASMEA402 WPL3-WPL 6 |
High Performance Steel |
ASTMIASME A860 WPHY 42-46-52-60-65-70 |
Standard:
ASME B16.9-2012,ASME B16.25-2012,ASME B36.10M-2004,ASME B36.19M-2004 |
MSS SP-75-2008,MSS SP-43-2013 |
EN 10253-1-1999.EN10253-2-2007,EN 10253-3-2008.EN 10253-4-2008 |
DIN 2605-1-1991,DIN 2605-2-1995 |
BS 1640-1-1962,BS 1640-2-1962,BS 1640-3-1968,BS 1640-4-1968,BS 1965-1-1963 |
GOST 17375-2001 |
AFNOR NF A49-289-1990,AFNOR NFA49-170-1-1999 ,AFNOR NFA49-170-2-2009. |
AFNOR NF A49-170-3-2009,AFNOR NFA 49-170-4-2009 |
ISO 3419-1981,ISO 5251-1981 |
GB/T 12459-2005, GB/T 13401-2005, GB/T 10752-2005 |
SH/T 3065-2005,SH/T 3408-2012 |
SY/T 0609-2006,SY/T 0518-2002, SY/T 0510-2010 |
DL/T 695-2014 GD 2000 GD 87-1101 |
Product details




Certifications
Packaging & Shipping
Company Profile

Hebei Cangrun Pipeline Equipment Co.,Ltd. specialized in pipe fittings ,flanges and nipples. Our company has strong technical force. With complete
production equipment, it has more than 120 sets of production equipment, including 8000 tons of four column press, 1600 tons of pushing machine,
800 tons of large pipe bending machine and 8 tons of forging hammer. It can produce valves, flanges, elbows, elbows, tees, crosses, reducers, pipe
caps, sockets and other pipe fittings and extension products of all specifications of carbon steel, alloy steel, stainless steel, pipeline steel, low-
temperature steel and other materials according to domestic and international and industrial standards, We adhere to quality first, customer first, is
our purpose.

FAQ
1. What about your MOQ ?
MOQ is one piece, we can offer sample for free, customer just pay the transport charge.
2.What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times
become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with
your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do
so.
3.What about payment term ?
You can make the payment to our bank account, Western Union or PayPal:
30% deposit in advance, 70% balance against the copy of B/L.
4. What about package ?
As usual with wooden pallet, wooden case, we can also pack the products as customers' requirement.