• ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap
  • ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap
  • ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap
  • ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap
  • ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap
  • ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap

ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap

Warranty: 1 Year
Head Code: Square
Connection: Welding
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap pictures & photos
ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap
US $0.35-1.25 / Piece
Min. Order: 1 Piece
Diamond Member Since 2023

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Manufacturer/Factory
  • Overview
  • Product Parameters
  • Detailed Photos
  • Company Profile
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
Cap 15
Shape
Equal
Material
Carbon Steel,Alloy Steel, Stainless Steel etc
Technics
Cold Forming
Certification
ISO, API, ANSI, DIN, JIS, ASME, GB, BS, SH, HG, CE, CCS
Special Function
Anti Corrosion
Application
Gas, Oil etc
Product Name
ASTM A105 Carbon Steel Butt Welded Sch80 Pipe End
Thickness
Sch10-Sch160
Surface Treatment
Sand Blasting
Ends
Beveling
Protective
Anti-Rust Oil ,Black Painting etc
Marking
as Customers′ Requirement
Usage
Gas Oil etc
Transport Package
Wooden Case, Wooden Pallet etc
Specification
1/2′-24"
Trademark
Hebei Cangrun Pipeline Equipment Co., Ltd.
Origin
China
HS Code
7307930000
Production Capacity
500000 PCS/ Year

Packaging & Delivery

Package Size
100.00cm * 100.00cm * 100.00cm
Package Gross Weight
500.000kg

Product Description

Product Parameters
Name CAP  
Size 1/2" - 48" or customized as required
Wall thickness Sch5-Sch160 XXS,STD,XS, SGP
Standard ASTM B16.9, GOST 17379-2001, DIN and JIS, etc.
We can also produce according to drawing and standards provided by customers.
Material Carbon steel, alloy steel and stainless steel.
We can produce according to materials appointed by consumers.
Packaging Wooden Cases, wooden pallet , carton box or as customers requirement
Surface Treatment Paintting black color , and Shot blasted,anti-rust oil ,
Quality ISO9001 : ISO2000-Quality-Systerm has been passed .
Others 1.Special design available according to your drawing.
2.anti-corrosion and high-temperature resistant with black painting
3. All the production process are made under the ISO9001:2000 strictly.
4. A conformity rate of ex-factory inspection of products.
5. we have export right , and we can quote FOB , CNF CIF price
Payment terms T/T,L/C
Loading port Tianjin/Qingdao/Shanghai Port
Export market Europe, Africa, Central Asia, Southeast Asia, Middle East, South America, North America, etc
 
Detailed Photos

 

ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap
ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap
 
ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap
ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap


Production Process
 
ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap
ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap
 
Company Profile

ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap

Hebei Cangrun Pipeline Equipment Co.,Ltd specialized in pipe fittings ,flanges and nipples. Our company has strong technical force. With complete

production equipment, it has more than 120 sets of production equipment, including 8000 tons of four column press, 1600 tons of pushing machine,

800 tons of large pipe bending machine and 8 tons of forging hammer. It can produce valves, flanges, elbows, tees, crosses, reducers, pipe

caps, sockets and other pipe fittings and extension products of all specifications of carbon steel, alloy steel, stainless steel, pipeline steel, low-

temperature steel and other materials according to domestic and international and industrial standards, We adhere to quality first, customer first, is

our purpose.

 
Certifications

 

ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap
ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap
ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap
 
FAQ

 

1. What about your MOQ ?

MOQ is one piece, we can offer sample for free, customer just pay the transport charge.

2.What is the average lead time?

For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times

become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with

your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do

so.

3.What about payment term ?

You can make the payment to our bank account, Western Union or PayPal:


30% deposit in advance, 70% balance against the copy of B/L.

4. What about package ?

As usual with wooden pallet, wooden  case, we can also pack the products as customers' requirement.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap pictures & photos
ASTM A105 Carbon Steel Butt Welded Sch80 Pipe Elbow Tee Reducer Flange End Cap
US $0.35-1.25 / Piece
Min. Order: 1 Piece
Diamond Member Since 2023

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Manufacturer/Factory
Registered Capital
3000000 RMB
Plant Area
>2000 square meters